I havnt been on as much due to my transition in finding a new job. I now have weekends off, so I have been spending more time on the capri, finaly.
Got the new roof done 2 weeks ago.
The following was also required when putting on the new roof, might be helpfull to those who might be thinking of doing it later on.
- Pivot arms; left & right
- Repairs to Foam ( I had no idea there was foam inside these roofs! LOL!)
- Elastic webbing
- Lower cables + cable pins etc.
The old one was in a disgracefull condition as you saw in my original pics.
Note: When the new roof does go on, your not allowed to put it down for at least 3 weeks. Not sure why, maybe to do with it stretching out or rather.
Cheers,